The staircase down from the street had previously been walled off, but now the wall and the fence on top of it had been altered to reopen the stairs onto the sidewalk. The path that wraps around under the railroad tracks to the train station has been cleared and repaved. The vines that had covered the carved stone on the wall have been cleared off. A new fence closes off the train tracks, replacing the ruins of the old iron fence that had been broken and partially consumed by decades of tree growth. Construction debris that had previously been dumped in this area was gone and the place looks remarkably clean. We saw a couple people stroll or jog through enjoying the path and stairs while we were there.